- Adhesives, Caulks, Foams & Sealants
- Cable Marking Signage
- Corrosion Protection & Coatings
- Desiccants
- ESD & Central Office Tools
- Fall Protection
- Fiber Optic Cleaners
- Fire Suppression Equipment
- First Aid Equipment
- Hand Cleaners
- Hazmat Shipping & Handling
- Heavy Duty Cleaners
- Herbicides
- Hurricane & Storm Restoration
- Insecticides
- Lubricants
- Maintenance, Repair & Operation Chemicals
- Paints & Marking Flags
- Pedestal Visibility
- Personal Protection
- Power Cable Cleaners
- Precision Cleaners
- Respiratory, Hearing & Eye Protection
- Rodenticides
- Specialty Cleaners
- Specialty Products
- Spill Kits & Components
- Telecom Cable Cleaners
- Tools, Supplies & Hardware
- Traffic Safety Equipment
- Utility Hole Entry Monitors
- Worksite Preparation & Protection
Pole Qwikset
Pole Qwikset is specially formulated for straightening and setting power utility poles when water is present in the hole. Pole Qwikset sets up in 5 to 10 minutes and hardware can be mounted within 15 minutes.
Pole Qwikset is packaged in a 50 lb pail producing 2/3rds of a cubic foot of non-expanding concrete material. Displacing water from the hole.
Pole Qwikset can also be used to patch cracks and holes to stop water from running into concrete structures such as; manholes, vaults, concrete pipes and conduit.
Pole Qwikset has a high compression strength of 5,000 PSI and creates a solid foundation for all types of utility poles, light poles, fence posts, etc.
Technical Data
Applications
Use Pole Qwikset when water is present in hole to set:
- New poles – transmission and distribution
- Leaning poles
- Decorative street light poles
- Security light poles
- Gate and fence posts
- Highway DOT sign posts
Contact Us
Rainbow Number | Container | Ordering UOM | Units/Case | Case Weight | Case Size |
---|---|---|---|---|---|
40590 | 5 Gallon Pail | Pail | 1 | 56 lbs | 5 Gallon Pail |
Fast setup so hardware can be mounted | Pole hardware can be mounted in 15 minutes |
Very high compression strength | Begins hardening as fast as 5 to 10 minutes. Creating 5000 psi strength |
Replaces traditional backfill | Saves time = Saving money |
Compressive strength was tested per ASTM C-109 and yielded the following results:
3 day break 3,462 psi
7 day break 4,025 psi
28 day break 5,000 psi
Note: compressive strength values and set times will vary according to soil type, temperature, moisture content, and other environmental conditions.